EXTENDED DIVERSION TIME OPERATIONS (EDTO)
ICAO Requirements for Extended Range Twin-engine Operations (ETOPS) have been in place since 1985, when they were introduced to apply an overall level of operational safety for twin-engined aeroplanes which was consistent with that of the mode three and four-engined aeroplanes then flying, to which no restrictions were applied.
عملیات با هواپیماهای دوموتوره از سال 1985 در جریان بوده است.
As aeroplane reliability and range improved, it became clear that all multi turbine-engined aircraft were pushing the boundaries of flight away from nearby alteates to increasingly distant ones and a review of the existing arrangements for ETOPS began.
با بهبود و ارتقاع ایمنی پرواز ها و با افزایش قابلیت هواپیما ها در پیمودن مسیر های طولانی تر ، زمزمه هایی در جهت تغییر
ٍETOPS
شروع شد.
After many years of discussion about how to broaden the facilitation of inteational flights for all large transport aeroplanes which necessitated tracks with no close-by diversion aerodromes (or could be more efficiently routed with the use of these tracks), led in 2012 to changes to ICAO Annex 6 Part 1 under Amendment 36.
پس از بحث و تبادل نظر های بسیار در مورد ارتقاع امکانات پرواز های بین المللی ، برای تمام هواپیماهای بزرگ پیکر ، در سال 2012 تغییر انکس 6 ایکائو در این راستا اعمال گردید.
This introduced the Extended Diversion Time Operations (EDTO)regime in place of ETOPS.
آنچه در پاراگراف های بالا توضیح داده شده است مربوط به جایگزینی سیستم EDTO به جای ETOPS می باشد.
However since then, although the EDTO regime has been widely accepted, the term EDTO has not been universally adopted the continued use of ETOPS is explicitly allowed for in Annex 6 provided that EDTO concepts "are correctly embodied in the conceed regulation or documentation".
هر چند سیستم EDTO به طور گستره فراگیر شده است اما اصطلاح EDTO به طور جهانی مورد پذیرش قرار نگرفته است.
Given this flexibility, the term 'ETOPS' has been retained by the FAA and others by redefining it as an abbreviation for 'ExTended range OPerationS' rather than as previously 'Extended range Twin OPerationS'.
عبارت ETOPS توسط سازمان فدرال FAA انتخاب شده است و ...
EASA currently continues to use ETOPS as originally defined and the abbreviation 'LROPS' (Long Range OPerationS) for extended range operation by three and four-engined aircraft.
آژانس ایمنی هوانوردی اروپا (EASA) همچنان از ETOPS در داکیومنت ها استفاده می نماید و همچنین از اصطلاح LROPS برای (عملیات های با فاصله زیاد) برای اشاره به هواپیماها و عملات های با هواپیماهای 3 و 4 موتوره استفاده می نماید.
Annex 6, and particularly Attachment D to that Annex, now contains guidance on extended range operations for all turbine-engined aeroplanes which are conducted beyond 60 minutes from a point where it is possible to fly to an en-route alteate aerodrome.
انکس 6 و بویژه ضمیمه D مربوط به این انکس ، شامل راهنمایی های مربوط به عملیات های نوع Extended Range و برای تمام هواپیماهای موتور توربینی که زمان پرواز آنها از نقطه شروع تا فرودگاه جایگزین بیش از 60 دقیقه باشد.
The main change is that a distinction is drawn between such operations which do not exceed an established 'Threshold Time' defined as "the range, expressed in time, established by the State of the Operator to an en-route alteate aerodrome, whereby any time beyond it requires an EDTO approval from that State".
تغییر اصلی در این است که ...؟؟؟...
ICAO uses the flying time at the one engine out speed in ISA and Still Air to convert Threshold Time to distance for aeroplanes with two engines but the all engines operating speed in ISA and Still Air for the same conversion for aeroplanes with more than two engines.
However, note that the FAA uses the one engine out speed as the basis for all aeroplane type EDTO approvals.
سازمان فدرال FAA سرعت مربوط به یک موتور را به عنوان مبنای محاسبات مربوط به هواپیماهای با مجوز EDTO در نظر میگیرد.
Non-EDTO flights are expected, without any detailed specification, to be subject to flight planning principles which are additional to those for 'normal' operations in respect of:
پرواز های Non-EDTO به پرواز هایی گفته می شود که ...؟؟؟
EDTO flights are subject to a process of explicit approval which, as with the former Extended Range Twin Operations system, has both aeroplane type design and aeroplane operational requirements.
الزام وجود دو شرط
نوع (تایپ) هواپیما و
الزامات عملیاتی هواپیما
System Safety in EDTO Extended Range Operations is based, as it was in the case of the original ETOPS concept, on two fundamental principles:
امنیت سیستم در EDTO (همان گونه که در ETOPS نیز چنین بود) بر دو اصل استوار است:
These principles are satisfied as previously by:
موارد ذکر شده فوق رعایت می شود همانگونه که در گذشته رعایت میگردید :
؟؟؟
Each EDTO Type Design or Operational Approval introduces the concept of Maximum Diversion Time so that an approved authorised area of operations can be defined.
؟؟؟
Type Design requirements have been amplified so that when the Maximum Diversion Time exceeds 180 minutes at one engine out speed in ISA and Still Air, the world fleet In-Flight Shut Down (IFSD) rate for the specific airframe/powerplant combination must be less than 0.01/1000 hours and the capability of time-limited systems, in particular the cargo fire suppression system relative to a maximum diversion at the All Engines Operating speed.
ICAO Annex 6 directs that unless a corresponding specific approval has been granted by the State of the Operator, an aeroplane with two or more turbine engines may not be operated on a route where the diversion time to an en-route alteate aerodrome from any point on the route, calculated in ISA and Still Air conditions at the One-Engine-Inoperative cruise speed for aeroplanes with two turbine engines and at the All Engines Operating cruise speed for aeroplanes with more than two turbine engines, exceeds a threshold time established for such operations by that State.
This must include:
؟؟؟
The submission to the Type Design Authority must be in the form of an 'EDTO-Configuration, Maintenance and Procedures (CMP) Document' which must contain "the particular aeroplane configuration minimum requirements,
including any special inspection,
hardware life limits,
MMEL constraints and maintenance practices found necessary to establish the suitability of an airframe-engine combination for EDTO".
Whilst each derivative of an aeroplane type variant requires explicit approval, Type Design Approval does not depend on in-service experience and recently-introduced aeroplane types have achieved EDTO qualification prior to initial entry into service.
An applicant for EDTO Operational Approval must apply in the manner specified by the State of the Operator.
در خواست مجوز EDTO به سبکی که سازمان هواپیمایی کشوری تعیین کرده است.
The type of approval process which is then followed will depend on whether the applicant has direct in-service experience with the candidate aircraft, for example one year of non-EDTO operations for a 120 minute twin engine approval or one year of 120 minutes EDTO operations for a 180 minute twin engine approval, or not.
With such experience, the 'In-service' (formerly called 'Conventional)' track is followed to develop a simplified Approval Plan but if an applicant is unable to demonstrate such prior experience then the longer 'Accelerated EDTO' approval track will apply.
Any applicant will be expected to:
تعیین مسیرهایی که متقاضی EDTO تمایل دارد در آن مسیر ها حرکت نماید.
توجه به تعمیر و نگهداری ویژه مربوط به EDTO و نیز پایش مصرف سوخت و IFSD و نیز ارزیابی مربوط به APU .
وجود سیستمی برای در یافت اطلاعات پلن پروازی EDTO مانند فرودگاه جایگزین و ...
اطمینان از وجود راه های ارتباطی مناسب و قابل اطمینان بین ایرلاین و هواپیما
اینکه APU با اطمینان در طول پرواز قابل روشن شدن باشد.
Before issuing an EDTO approval, a State must normally ensure that the maximum diversion time for the operator of a particular aeroplane type does not exceed the most limiting EDTO-significant-system time limitation which is relevant to that particular operation and identified in the AFM (directly or by reference) is not exceeded and, in the case of aeroplanes with two turbine engines only, that the aeroplane type involved is EDTO certified.
However, if a specific safety risk assessment conducted by the aeroplane operator has demonstrated to the satisfaction of the State that an equivalent level of safety can be maintained during operations beyond the time limits of the most time-limited system, then there is discretion to approve such an operation. The specific safety risk assessment required to allow this exceptional EDTO approval to be granted must:
شرایط لازم جهت اخذ مجوز EDTO :
A representation of the EDTO regulatory regime (Source ICAO)
Any EDTO approval issued by a State must also reference the need for compliance with the EDTO critical fuel scenario established by the State and any flight conducted under an EDTO approval must not continue beyond the specified Threshold Time until the identified alteates have been re-evaluated for their continued availability and current information indicates that, during the period of time when their use might be required, the prevailing conditions at those aerodromes will not be less than the applicable aerodrome operating minima.
If this is not the case, then an alteative course of action, which does not involve exceeding the applicable Threshold Time must be determined.
Approvals for aeroplanes with two turbine engines are also required to take into account the following when determining if such an approval will provide the overall level of safety for any flight intended by the provisions of ICAO Annex 8 in respect of:
سه شرط مهم زیر :
The continued applicability of EDTO approvals depends on the reporting of any EDTO Relevant Event - defined as "any system malfunction, degradation or other in-flight event that requires the crew to make a decision whether to tu back, divert or continue under an increased level of alertness".
It is understood that the majority of these events occur because of non-technical circumstances such as
مواردی که ممکن است در روند پرواز EDTO خلل ایجاد نماید :
adverse weather,
passenger medical issues,
flight or ground personnel error
and bird strikes.
However, awareness of technical events allows oversight of continued airworthiness by both aeroplane manufacturers and their primary certifying authorities so that any necessary corrective actions can be and are promptly identified and implemented.
ICAO SARPs include a specific Recommendation that State ETOPS approvals issued prior to 25 March 1986 which permitted operations beyond the Threshold Time since established for such operations "should give consideration to permitting such an operation to continue on that route after that date".
Part-DEF in Air-Ops تعارف شماره 11تا 20...ما را در سایت Part-DEF in Air-Ops تعارف شماره 11تا 20 دنبال میکنید